Engineering Construction Permits

Until further notice, City Hall remains closed to the public. During Phase 2 Construction Restart, all permit applications are accepted. Note: Compliance to COVID-19 mandates has created longer permit processing times. Permit applications are located below. 

Intake Appointment Requests are responded to in the order they are received. Please allow at least 5 business days for a date and time confirmation for your appointment. 

Permit submissions are processed in the following manner:




City Website Portal

Mail/Drop-off*

Appointment Required with Permit Specialist

  • Single Family
    • Electrical
    • Mechanical
    • Plumbing
    • Roof
    • Sewer Repair/New
    • Window Replacement (Only) Permit
  • Building Permit
    • Minor exterior work only to include roof overlay or re-roof
    • Siding and/or windows
  • Deck Permit
  • Driveway Permit
  • Fence Permit
  • Fire Prevention Operational Permit
    • Temporary Use
    • Special Events
    • Underground and Above Ground Fuel Tanks
  • Shed Permit
  • Solar Permit
  • Utility and Communication Companies
  • Violation/Investigation
  • Wall/Rockery Permit
  • Water Meter
  • Civil
  • Commercial/Multi-family Building
  • Fire Protection Systems Construction Application
    • Fire Alarm
    • Fire Sprinkler
  • Land Use
  • Low Voltage Electrical - Commercial
  • New Construction or Addition
  • Plumbing/Electrical/Mechanical Plan Review
  • Single Family Building Addition or Remodel
  • Tenant Improvement

*The Development Permit intake box is located in the second floor lobby of the interior of the building, by the door to City Hall. A permit specialist will confirm receipt and invoice fees due in order to begin processing

Your project must have issued permits on-site, require workers to be six-feet apart, and have a developed exposure control, mitigation, and recovery plan. Washington State Department of Labor & Industries will enforce requirements for contractors to comply with comprehensive COVID-19 exposure control, mitigation, recovery plans and safety practices.

Click here to schedule an intake appointment

Intake Appointment Construction Plans
Engineering Staff

Current engineering standards, guidelines, fee schedules, checklists and application forms are listed below. The Permit Contact Information Form is required with most applications. Please refer to the proper checklist to determine if it needs to be included with your submittal.

It is important to provide all required documentation, specified on the checklists and guidelines, with the complete permit application. The required fee(s) will be due at the time the permit application is submitted. Please consult the Permit FAQ’s to address questions you may have. If your question is not on our FAQs, please fill out the Ask a Permit Specialist Form.
- 425-744-6267 for Building, Fire and Engineering permits
- 425-744-6284 for Planning and Land Use approvals

Engineering Forms and Fees