Projects Bidding

Bid Date: 12/5/2018 @ 10:00 am PST

Main Street Revitalization Project - Phase 1, City of Mountlake Terrace, WA #2013-15

$9,250,000 to $9,750,000

Plans

Specs

Addenda (check back for updates)

Owner:
City of Mountlake Terrace
6100 219th Street SW, Suite 200
Mountlake Terrace, WA 98043-4697
425-776-1161

Contact:
Abiy Tsegaye, Civil Engineer I
City of Mountlake Terrace
atsegaye@ci.mlt.wa.us
425-744-6273

Description:
This project provides for the improvement of 236th Street SW, between the I-5 off ramp and 56th Avenue W including reconstruction of approximately 4,000 linear feet of cement concrete traffic curb and gutter, 18 cement concrete sidewalk ramps (curb ramps), 4,900 tons of HMA for new pavement, 1,500 linear feet of 8"ϕ and 12"ϕ solid wall PVC and class 52 ductile iron pipe storm drain, 380 linear feet of 10"ϕ and 18"ϕ solid wall PVC sanitary sewer, 31 catch basin structures, 58 utility vaults, over 37,200 linear feet of 2"ϕ, 3"ϕ, 4"ϕ, and 6"ϕ solid wall PVC schedules 40 and 80 for undergrounding of aerial utilities, 3 fire hydrants, relocate existing water service meters, remove and dispose of existing fire hydrant, and RRFB pedestrian sign system, new, modified, and replaced traffic signal systems, a new illumination system and associated junction boxes and conduit, handrail, fencing, retaining wall, utility casting, roadway signage, landscaping and irrigation, utility casting and monument case adjustments, pavement markings, property restorations, and other work.

Also Listed on:
www.bxwa.com